Building Dreams One Field At A Time

Case Studies

Renovated natural grass baseball field that included removing all the turfgrass from the field, removed approximately four (4”) inches of soil and organic material, elevated the area around the pitcher’s mound to create positive surface drainage and install two (2) underdrain lines under the infield grass, reconstructed the pitcher’s mound, laser graded the field and the existing outfield warning track, installed new underdrain system on the field , installed new irrigation system, added four (4”) inches of customized blended rootzone material on all grassed areas, installed new synthetic turf on the warning track between the dugouts, installed a new synthetic turf halo with Mississippi State logo around the catcher’s circle and re-sodded all grassed areas with TifSport Bermuda Grass. Other work included lengthening both dugouts and adding a camera well at the end of each dugout.

Year: 2010
Other projects completed for Mississippi State University:

  • Renovation of Women’s Softball Field
  • Construction of Women’s Soccer Stadium Field

Construction of a new multi-sport indoor practice facility that included a 100-yard synthetic AstroTurf® XPE42 GameDay grass field with a six (6”) inch graded aggregate stone base. Project also included the construction of two (2) outdoor sand-based rootzone practice fields with an underdrain system, irrigation system, four (4”) inch gravel blanket and eight (8”) inch customized blended rootzone media. Fields were sodded with 2” thick cut sod.

Year: 2011
Other projects completed for Auburn University:

  • Renovation of football field at Jordan-Hare Stadium
  • Renovation of Hitchcock Field @ Plainsman Park (Baseball Field)
  • Renovation of Women’s Softball Complex
  • Construction of Women’s Soccer Stadium Field

Designed and constructed the synthetic FieldTurf® Duraspine® turf with a six inch laser graded stone base and underdrain system. Constructed new 400 meter, 8-lane running track with a polyurethane sandwich resilient surface system.

Year: 2009


Constructed new athletic facility for a school in Douglasville, GA. Project included football fields, a track, tennis courts, a baseball field, a softball field, and a soccer field. The football field is a synthetic turf (FieldTurf® Duraspine Pro®) field and the practice football field is a sand capped field sodded with certified TifSport® Bermuda. The fields have custom irrigation designed by Sports Turf Company. Constructed a 400 meter, 8-lane, running track with a 10 mm full pour polyurethane resilient track surface system. Constructed six (6) tennis courts with the ColorCoat® surfacing system by Laykold®.

Year: 2011


Constructed a natural grass soccer field for Kennesaw State University and Atlanta’s Women’s professional soccer team. This field is a sand based rootzone field with an underdrain system, 4” gravel blanket, 8” rootzone media, irrigation system and sodded with Certified “Blue tag’ TifSport Bermuda grass. KSU Stadium hosted the NCAA Division 1 Women's Championship Cup in November 2011.

Year: 2010
Other projects completed for Kennesaw State University:

  • Construction of new 400 meter, 8-lane running track with a Rekortan M-99 full pour polyurethane surfacing system - completed December 2011.


Constructed new natural grass soccer field with a four inch gravel blanket, eight (8”) inch customized blended rootzone media, underdrain system, irrigation system and sodded with Georgia Certified “Blue Tag” Tifsport Bermuda grass.

Year: 2011

Other projects completed for Samford University:

  • • Renovation of football field to synthetic turf football field
  • • Renovation of Baseball Stadium field